IMERI H&S Partners knowledge centre
Construction health and safety guides.
Clear answers for contractors, developers, architects and clients making decisions before construction work starts.
Find the guidance you need
Browse by task or responsibility.
Choose a topic below. Each guide links to relevant services where you need help applying it to your own project.
RAMS by trade and task
Plan the assessment, work sequence and project-specific controls for your activity.
Concrete Pumping RAMS: What Contractors Should Include
How to coordinate pump selection, setup, ground and outriggers, pipeline and end-hose control, pour readiness, wet cement and stop-work arrangements.
Read the guide →Can the Same RAMS Be Used on Different Construction Sites?
What contractors can retain in a controlled RAMS core, what must be checked for each project and how to manage appendices, briefing and revision.
Read the guide →Metal Stud Partition Framing RAMS: What Contractors Should Include
How to plan framing scope, set-out, materials, cutting, floor and soffit fixings, access, stability, service interfaces and inspection before boarding.
Read the guide →Site Welfare Setup & Maintenance RAMS: What Contractors Should Include
How to plan welfare layout, delivery, positioning, service connections, cleaning, inspections, servicing and project change control.
Read the guide →Fire Stopping Installation RAMS: What Contractors Should Include
How to connect RAMS with the specified tested system, opening register, competent installation, inspection hold points and handover evidence.
Read the guide →Portable Power Tools RAMS: What Contractors Should Include
How to control several tools through a tool-task register, compatible accessories, checks, electricity, dust, noise, vibration and change control.
Read the guide →Snagging & Minor Repair Works RAMS: What Contractors Should Include
How to control varied snagging tasks through a task register, surveys, tools, dust, access, occupied areas, inspection and change control.
Read the guide →Thermal & Acoustic Insulation RAMS: What Contractors Should Include
What project-specific RAMS should cover for specified products, voids, asbestos information, handling, fibres, cutting, access and concealed-work inspection.
Read the guide →Sanding & Surface Preparation RAMS: What Contractors Should Include
What project-specific RAMS should cover for substrates, coatings, asbestos and lead information, dust, tools, extraction, access and inspection.
Read the guide →Installed Edge Protection RAMS: What Contractors Should Include
What project-specific RAMS should cover for handover, checks, access, loading, inspection, defects and change control around installed edge protection.
Read the guide →Sealants, Adhesives & Expanding Foam RAMS: What Contractors Should Include
What project-specific RAMS should cover for products, substrates, COSHH, ventilation, application, curing, inspection and change control.
Read the guide →Landscaping, Planting & Topsoil RAMS: What Contractors Should Include
What project-specific RAMS should cover for drawings, ground, buried services, deliveries, plant, topsoil, planting, products, weather and handover.
Read the guide →Waterproofing Membrane RAMS: What Contractors Should Include
What project-specific RAMS should cover for systems, substrates, products, preparation, access, hot work, weather, inspection and handover.
Read the guide →Builders Clean & Final Cleaning RAMS: What Contractors Should Include
What project-specific RAMS should cover for area release, construction dust, waste, chemicals, sharps, access, wet floors, inspection and handover.
Read the guide →Door & Ironmongery Installation RAMS: What Contractors Should Include
What project-specific RAMS should cover for schedules, handling, openings, fixings, tools, dust, access, testing and handover.
Read the guide →Flooring Installation RAMS: What Contractors Should Include
What project-specific RAMS should cover for surveys, substrates, moisture, preparation, adhesives, handling, cutting, installation and inspection.
Read the guide →Bathroom Refurbishment RAMS: What Contractors Should Include
What project-specific RAMS should cover for surveys, isolations, strip-out, dust, handling, waterproofing, services, sequencing and inspection.
Read the guide →Kitchen Installation RAMS: What Contractors Should Include
What project-specific RAMS should cover for drawings, deliveries, handling, fixings, tools, wood and stone dust, worktops, appliances and inspection.
Read the guide →Wall & Floor Tiling RAMS: What Contractors Should Include
What project-specific RAMS should cover for substrates, layouts, handling, cutting, products, wet areas, access, inspection and change control.
Read the guide →Block Paving & Patio Installation RAMS: What Contractors Should Include
What project-specific RAMS should cover for design, ground, buried services, handling, cutting, compaction, cement, traffic and inspection.
Read the guide →Drilling, Anchors & General Fixings RAMS: What Contractors Should Include
What project-specific RAMS should cover for approved fixing locations, substrates, concealed services, asbestos, dust, tools, anchors and inspection.
Read the guide →Manual Handling RAMS: What Contractors Should Include
What project-specific RAMS should cover for construction materials, including loads, routes, lifting aids, task demands, capability and change control.
Read the guide →Stepladders & Podium Steps RAMS: What Contractors Should Include
What project-specific low-level access RAMS should cover for selection, setup, checks, safe use, exclusion and change control.
Read the guide →Mobile Tower Scaffold RAMS: What Contractors Should Include
What project-specific tower RAMS should cover for selection, competence, assembly, stability, inspection, use, movement and dismantling.
Read the guide →MEWP Operation RAMS: What Contractors Should Include
What project-specific MEWP RAMS should cover for machine selection, ground, operators, inspections, entrapment, falling objects, weather and emergency rescue.
Read the guide →Drainage & Shallow Pipework RAMS: What Contractors Should Include
What project-specific RAMS should cover for buried services, shallow excavation, pipe handling, laying, jointing, testing, backfill and confined-space limits.
Read the guide →Construction Waste & Skip RAMS: What Contractors Should Include
What project-specific RAMS should cover for waste segregation, handling, skips, vehicle movements, hazardous findings, records and removal.
Read the guide →Soft Strip RAMS: What Contractors Should Include
What project-specific RAMS should cover for non-structural strip-out, including surveys, isolations, structural limits, sequence, dust, access and waste.
Read the guide →Reinforcement Fixing RAMS: What Contractors Should Include
What project-specific RAMS should cover for routine steel fixing, including drawings, handling, lifting, stability, tying, tools, access and inspections.
Read the guide →Carpentry & Joinery RAMS: What Contractors Should Include
What project-specific RAMS should cover for routine carpentry and joinery, including drawings, handling, cutting, fixings, wood dust, access and protection.
Read the guide →Angle Grinder & Abrasive Cutting RAMS: What Contractors Should Include
What project-specific RAMS should cover for angle-grinder work, including wheel selection, guarding, restraint, sparks, dust, noise and vibration.
Read the guide →Electrical First & Second Fix RAMS: What Contractors Should Include
What dead-working electrical RAMS should cover, including competence, safe isolation, hidden services, installation, testing and energisation.
Read the guide →Material Deliveries RAMS: What Contractors Should Include
What project-specific RAMS should cover for delivery booking, vehicle routes, unloading, load stability, lifting, distribution and storage.
Read the guide →Plumbing First & Second Fix RAMS: What Contractors Should Include
What project-specific RAMS should cover for routine plumbing, including services, isolations, drilling, jointing, sanitaryware, testing and commissioning.
Read the guide →Painting & Decorating RAMS: What Contractors Should Include
What project-specific RAMS should cover for routine painting and decorating, including substrates, preparation, COSHH, access, ventilation and occupied areas.
Read the guide →Plastering & Internal Rendering RAMS: What Contractors Should Include
What project-specific RAMS should cover for plastering and internal rendering, including substrates, products, mixing, access, dust, COSHH and drying.
Read the guide →Floor Screeding RAMS: What Contractors Should Include
What project-specific RAMS should cover for sand/cement and proprietary screeds, including delivery, mixing or pumping, cement exposure, handling, curing and protection.
Read the guide →Fencing & Timber Hoarding RAMS: What Contractors Should Include
What project-specific RAMS should cover for fencing and timber hoarding, including design, buried services, post holes, wind, public protection and inspection.
Read the guide →Suspended Ceiling RAMS: What Contractors Should Include
What project-specific RAMS should cover for suspended ceiling grids and tiles, including hangers, fixings, access, overhead work and service coordination.
Read the guide →Window Installation RAMS: What Contractors Should Include
What low-risk window installation RAMS should cover, including delivery, lifting, openings, access, fixings, glazing and project-specific change control.
Read the guide →Drylining RAMS: What Contractors Should Include
What project-specific RAMS should cover for metal studs and plasterboard, including board handling, access, dust, concealed services and coordination.
Read the guide →Who Should Prepare and Review Construction RAMS?
Who owns the assessment and method, what a Principal Contractor's review should test, and why acceptance does not transfer the contractor's duties.
Read the guide →Concrete Placement RAMS: What Contractors Should Include
A practical guide to small and routine concrete pours, covering readiness checks, deliveries, formwork, wet cement, vibration, hold points and change control.
Read the guide →Brickwork & Blockwork RAMS: What Contractors Should Include
A practical guide to planning masonry work, covering temporary stability, scaffolds, material loading, cutting dust, mortar and project changes.
Read the guide →Groundworks RAMS: What Contractors Should Include
A practical checklist for planning shallow excavation, formation and related groundworks, including buried services, plant, inspections and change control.
Read the guide →CDM duties and construction planning
Understand appointments, project information and the records needed from planning to handover.
Principal Designer to Principal Contractor Handover
What information should transfer before site start, how to control gaps and hold points, and what liaison must continue during construction.
Read the guide →Construction Contractor Pre-Start Meeting Checklist
What clients, Principal Contractors and subcontractors should agree about scope, design, RAMS, logistics, welfare, emergencies and hold points before work begins.
Read the guide →Construction Design Risk Assessments: What Should Designers Record?
What CDM requires designers to do, when a design-risk register helps and which decisions and residual risks should reach the project team.
Read the guide →CDM Client Duties: A Pre-Construction Checklist
What commercial clients must arrange before construction starts, what to monitor during delivery and which information must be retained.
Read the guide →What Health and Safety Documents Does a Principal Contractor Need?
A practical checklist of core project records, contractor information and risk-dependent documents—without treating every site as identical.
Read the guide →Construction Phase Plan vs RAMS: What Is the Difference?
The different purpose, ownership and review requirements of the project-wide Construction Phase Plan and task-specific RAMS.
Read the guide →When Is an F10 Notification Required?
How to test the duration, simultaneous-workforce and person-day thresholds, identify who must notify HSE, and keep the notice current.
Read the guide →CDM Health and Safety File: What Should It Contain?
Who prepares the CDM Health and Safety File, what belongs in it, what should be excluded, and how clients should handle handover and retention.
Read the guide →Pre-Construction Information: What Clients Should Provide
A practical CDM 2015 guide to the information clients should assemble, when designers and contractors need it, and how to manage gaps and updates.
Read the guide →CDM Principal Designer vs Building Regulations Principal Designer
An England-specific guide to the two legal roles, their different purposes, appointment triggers and competence requirements.
Read the guide →What goes in a Construction Phase Plan?
A practical guide to CPP contents, responsibilities and updates for contractors and principal contractors under CDM 2015.
Read the guide →Do I need a CDM Principal Designer?
A practical decision guide for commercial and domestic construction clients, including multi-contractor projects, appointments and common misconceptions.
Read the guide →Site management and inspections
Find guidance on welfare, inductions, temporary works, inspections and responding to HSE visits.
When Should a Construction Phase Plan Be Updated?
How to use planned and change-triggered reviews, revise the affected arrangements, control document status and communicate changes on site.
Read the guide →Does CHAS Accreditation Replace Contractor Competence Checks?
How to use a valid CHAS or SSIP certificate at prequalification while completing the project-specific checks required before appointment and mobilisation.
Read the guide →Construction Site Welfare Facilities: What Must Be Provided?
What must be available from day one, who is responsible, and how to plan toilets, washing, drinking, changing, eating and rest facilities.
Read the guide →Construction Site Inspection vs Health and Safety Audit
The difference between checking current site conditions and reviewing whether management arrangements work across a project or business.
Read the guide →What Should a Contractor Do After an HSE Construction Site Visit?
How to identify the outcome, control immediate risks, manage deadlines and assemble credible close-out evidence after an HSE visit.
Read the guide →Who Is Responsible for Temporary Works?
How clients, designers, Principal Contractors, contractors and Temporary Works Coordinators fit into a controlled design and site process.
Read the guide →What Should a Construction Site Induction Cover?
Who must provide a site-specific induction, what workers and visitors need to know, and when the information should be reviewed or repeated.
Read the guide →How Often Should Construction Sites Be Inspected?
How to set a risk-based inspection programme, distinguish general assurance from statutory checks and avoid relying on a universal weekly rule.
Read the guide →Construction COSHH Assessments: What Contractors Should Check
How to assess supplied products and process-generated hazards, choose controls and brief the workforce instead of filing a safety data sheet as the assessment.
Read the guide →Contractor accreditation
Organise company evidence for an application, renewal or assessor query.